50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Interruptible loads
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • Supplier portal
      • Frequently Asked Questions
      • Downloads
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
    • History
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
      • Offshore projects
        • Combined Grid Solution
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
      • Interconnectors and phase shifters
      • Concluded projects
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
        • Ostwind 1
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
        • Protection for people and nature
        • Bird protection
        • Overhead line and cable
        • Cost-effectiveness
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Production
        • Grid feed-in
        • Photovoltaics
        • Wind power
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Outage planning
        • Outages
        • Redispatch Calculator SWKL
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
    • Positions
  • Grid customers
    • Grid connection
    • Grid access
  • Balancing group customers
  • Market communication
  • System services
    • Interruptible loads
    • Utilisation before limitation
    • Grid losses
    • Grid reserve
  • Standard contracts
  • Suppliers
    • Supplier portal
    • Frequently Asked Questions
    • Downloads
  • EEG registration
Show All
Home/Partners/Suppliers/Supplier portal

Supplier portal

Read more

  • ​FAQ FOR THE SUPPLIER PORTAL​​​
  • DOWNLOADS

Login Supplier Portal

Please use the Microsoft Internet Explorer for the registration. Other browsers are currently not supported.

With the registration you accept the terms of use of the P2P portal. You also find hints of how to use the portal on this page or you can contact the procurement department for help.

The password must contain 8 letters, thereof minimum one small and one capital letter as well as one figure.

  • LOGIN

With the supplier portal, 50Hertz introduced a software solution based on the SAP Supplier Lifecycle Management (SLC) and SAP Supplier Self Services (SUS) modules. In combination with the Bidding Engine module, all aspects of supplier management are represented and handled via the supplier portal.

The supplier lifecycle at 50Hertz

All processes are handled via the portal: registration, actualisation of master data, handling of tendering processes, orders, payments and assessment of the collaboration with 50Hertz (at both ends). The supplier portal ensures both, efficient communication and optimal execution.

Process in the supplier portal

The 50Hertz supplier portal is optimised for use in Windows Internet Explorer. You can download an overview of the browsers supported by the supplier portal in this side's download section (check top of page for the link). When using the portal in a browser that is not listed in the overview, misrepresentations of portal views, e.g. missing templates and functions, are possible.

You can find the frequently asked questions (FAQ)  here.

CONTACT

50Hertz Purchasing

Heidestraße 2 | 10557 Berlin
  • Tel:
    +49 (0) 30 5150-0
  • E-Mail:
    purchasing@50hertz.com
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login